FRP Cooling Tower

YAOTONG: Water Treatment Equipment Manufacturer in China

Wuxi Yaotong Environmental Protection Machinery Co., Ltd. is located in Wuxi, a region with the most vibrant private economy in the Yangtze River Delta. The company is mainly engaged in the research and development, design, production, installation and construction of water treatment and flue gas treatment technologies, as well as general contracting and operation management services. It has a variety of technical R&D personnel engaged…

Digital and Intelligent Water Governance, Greening China - Smart Water Treatment Solution Provider

Wuxi Yaotong Environmental Protection Machinery Co., Ltd. is located in Wuxi, a region with the most vibrant private economy in the Yangtze River Delta. The company is mainly engaged in the research and development, design, production, installation and construction of water treatment and flue gas treatment technologies, as well as general contracting and operation management services. It has a variety of technical R&D personnel engaged…

Edit Content

2007

Company Establishment

Started in 2007 in Wuxi, Yangtze River Delta, the birthplace of Chinese national industry

Edit Content

2008- 2010

Entering the circulating water treatment of the steel and metallurgical industry

We won water treatment EP contracts from WPS, Beihai Chengde Nickel Industry and other companies to try our hand at it.

Edit Content

2011-2014

We continue to make efforts in the field of metallurgical water treatment and become a qualified supplier for many domestic metallurgical design institutes, and our business scope continues to expand.

Edit Content

2015-2017

Obtained multiple certificates and patents from high-tech enterprises, private technology enterprises, etc.

Continue to invest in the design and development phase to cultivate internal strength

Edit Content

2018-2020

The new factory was put into operation, and the company entered into the agricultural pollution control and municipal business sectors and achieved success.

New products such as pressure-bearing integrated and double cyclone filters were launched on the market

Edit Content

2021-2022

Expanded overseas markets, won bids for multiple overseas EPC projects, and further expanded the scale of the enterprise

Received orders from Indonesia, Malaysia, Russia and other countries

Edit Content

2023-Now

Continue to expand into overseas markets, enter Africa, the Middle East and other places, and go overseas to become the mainstream

Wuxi, China

No. 22, Xingjie Road, Qianzhou Supporting Area, Huishan District, Wuxi City

The R&D team holds 73 patents.
0 +
We provide industrial wastewater treatment solutions for over 30 countries worldwide and have implemented more than a hundred projects.
0 +

Our partners

FRP Cooling Tower

Description

The FN series square counterflow fiberglass cooling tower is an energy-saving new product. This product applies the patent of “energy-saving fiberglass cooling tower”, especially the cooling

tower fan is equipped with a variable torque off-pole two-speed motor. When the temperature is low (such as at night), the motor runs at low speed and the cooling tower noise can be reduced by 3-5dB(A). In addition, the energy saving effect of using a twospeed motor is significant. After calculation, when multiple cooling towers are equipped with single-speed motors, although some of the motors can be stopped to save energy when the air wet-bulb humidity is low, it still consumes 40% more power (in years) than using two-speed motors. ). This product also applies the patent of “oblique trapezoidal wave filler sheets for square counterflow cooling towers”, and its thermal and resistance characteristics are better than other fillers.

Specification

Square counterflow cooling tower has three series, nine models, ninety products: product performance and selection.

  1. Design parameters: industrial tower: air wet bulb temperature τ = 28 ℃, cooling tower temperature drop: 10 ~ 25 ℃. Civil tower: air wet bulb temperature τ = 28 ℃, cooling tower temperature drop: 5 ~ 8 ℃.
  2. Choose the tower need to know the cooling water Q, into the tower water temperature t1, out of the tower water temperature t2, air wet bulb temperature τ.
  3. The cooling tower materials can withstand -50 ℃ low temperature, but for the coldest average monthly temperature is less than -10 ℃ of the region should be specified when ordering in order to take anti-icing measures.
  4. The turbidity of the circulating water is not greater than 50 mg / liter, short-term not greater than 100 mg / liter. Should not contain oil and mechanical impurities. Algae and water quality stabilization measures need to be taken when necessary.
  5. The direction of the inlet and outlet pipes of the cooling tower can be rotated according to 90°, 180°, 270°.
  6. Water distribution system is designed according to the nominal water flow, such as the actual amount of water and the nominal amount of water difference in +15% or more, the order should be specified in order to modify some of the data.
  7. Cooling tower water temperature does not exceed 60 ℃, such as more than 60 ℃ should be specified when ordering.
  8. Fan blade installation angle adjustable, but to keep the angle consistent. And the current of the motor does not exceed the rated current of the motor.
  9. The fan can be short low-speed reversal to eliminate ice.
  10. When using the cooling tower water pan as a pool must be installed separatel”automatic water supply pipe”, “rapid water supply pipe”, “drain pipe”, “overflow pipe “, when ordering must be put forward in particular, the cost of another.
  11. Motor, fan are supporting the supply, need to be sent to the site of the factory staff installation or technical guidance.

Design Condition

Dry Bulb Temperature θ=31.5℃,

Wet Bulb Temperature τ=28℃,

Atmospheric Pressure P=100.4KPa,

Temperature Range: 43-33℃,

SS ≤ 50ppm.

Design Description

  1. The data in the table is for a single tower, and the number of tower groups can be combined according to requirements.
  2. The elevation of each foundation is the same, the allowable deviation is ±-2mm, and the allowable deviation of the center of each foundation is ±2mm.
  3. The tower columns are welded in position to the pre-embedded steel plates of the foundation.
  4. Please ask for detailed basic drawings separately.

Send Your Inquiry Today